2026 NEC changes for the Alabama electrician exam
The Alabama Electrical Contractors Board starts testing on the 2026 NEC on January 1, 2027. Whole articles were renumbered, so a code book tabbed for 2023 will send you to the wrong page. These are the changes that matter most on test day.
| What | 2023 NEC | 2026 NEC |
|---|---|---|
| Load calculations | Article 220 | Article 120 |
| Energy management systems | Article 750 | Article 130 |
| Fire-resistive cable systems | Article 728 | Article 772 |
| Snap switch device rules | Article 404 | Article 406 |
| Dwelling lighting load for services | 3 VA per ft² | 2 VA per ft² (120.41) |
| Dwelling outdoor outlet GFCI | Up to 50 A | Up to 60 A (210.8(F)) |
| Dwelling service disconnect | Inside or out | Outdoors, on or within sight (230.70) |
Articles that changed number
- Load calculations: Article 220 is now Article 120, in Chapter 1.
- Energy management systems: Article 750 is now Article 130. Part II covers power control systems.
- Fire-resistive cable systems: Article 728 is now Article 772.
- Snap switches (single-pole, 3-way, 4-way): device rules moved from Article 404 into Article 406, now titled for wiring devices.
- Limited-energy systems: Chapter 7 (Articles 720–760) now holds the main rules, including communications. Chapter 8 covers only communications outside and entering buildings.
- Over 1,000 V AC / 1,500 V DC: new Articles 245, 265–268, 270, 305, 315 and 495. Article 235 was deleted.
- New Article 624 covers forklifts, golf carts and other vehicles that aren't EVs.
- New Annex L shows the planned 2029 layout.
Numbers that changed
- Dwelling general lighting for service and feeder calculations: 2 VA per square foot (120.41). It was 3 VA.
- Counting general lighting branch circuits still uses 3 VA per square foot (120.13).
- Dwelling outdoor outlet GFCI: up to 60 A, single-phase, 150 V to ground or less (210.8(F)). It was 50 A.
- Docks and piers: GFPE set at 100 mA or less (555.35(A)).
- Arc-flash labels: the 1,000 A threshold is gone for other-than-dwelling service and feeder equipment, and labels carry the assessment date (110.16).
Test yourself on the 2026 changes
The course has a drill set on just the 2026 changes, plus the new rules worth tabbing, like outdoor service disconnects and damaged-conductor replacement.
Summaries are in our own words; always check the 2026 NEC itself. Sources include IAEI, EC&M and the AECB.